6-20
920011-649
Operator Manual
Routine Maintenance
6.13 Lubrication of
Leak Test Hose
Assembly O-Ring
See Figure 6-9.
1. Leak test hose assembly maintenance kit (P117034-898)
contains grease and lubrication tool.
2. Apply a small amount of grease on extremity of lubrication tool.
3. Gently slide extremity of tool on surface of endoscope
connection O-ring to lubricate.
6.14 Replacement of
Leak Test Hose
Assembly O-Ring
See Figure 6-9.
1. Leak test hose assembly maintenance kit (P117034-898)
contains replacement O-ring and lubrication tool required for O-
ring replacement.
2. Using a small object such as a pin or a needle, remove O-ring
from leak test connector.
3. Once removed, identify proper replacement O-ring from the
ones provided in leak test hose assembly maintenance kit.
4. Using lubrication tool from maintenance kit, install new O-ring at
same location of previously removed O-ring.
IMPORTANT: DO NOT use pin or needle to reinstall new O-ring.
New O-ring will get damaged.
5. Proceed with O-ring lubrication as per procedure given in
.
Figure 6-9. Endoscope Connection O-Ring
O-Ring
Summary of Contents for P920011-649
Page 1: ...OPERATOR MANUAL Reliance EPS Endoscope Processing System 2022 03 10 P920011 649 ...
Page 2: ......
Page 13: ...xi 920011 649 Operator Manual Table of Contents ...
Page 17: ...xiv 920011 649 Operator Manual List of Tables Healthcare Capital Equipment ...
Page 25: ...1 8 920011 649 Operator Manual Safety Precautions Healthcare Capital Equipment ...
Page 45: ...3 16 920011 649 Operator Manual Component Identification Healthcare Capital Equipment ...
Page 167: ......
Page 168: ...STERIS Corporation 5960 Heisley Road Mentor OH 44060 1834 USA 440 354 2600 800 548 4873 ...