Spike Systems: PBG System Family Installation
iv
Figure 43 – Replacement of Inner Panels Control and Non-‐Control Cabinets ............39
Figure 44 – AC Power Junction Box Inside Control Cabinet................................................40
Figure 45 – Location of Flexible Conduit Installation to AC Junction Box.....................41
Figure 46 – Traffic Control Lighting Installation Guidelines...............................................41
Figure 47 – Location of Traffic Control Mounting Adapter, Control Cabinet...............42
Figure 48 -‐-‐
Assembled Traffic Control Mounting Adapter, Control Cabinet
....................42
Figure 49 – Traffic Control Signal Wiring....................................................................................43
Figure 50 – Installation Location of Field Connection Barrier Operator.......................44
Figure 51 – Limit Switch Wiring (Usually Performed at Factory)....................................45
Figure 52 – Electronic Control Panel Components, Control Cabinet...............................46
Figure 53 – Siemens S7-‐1200 PLC, Control Cabinet -‐-‐ With (Top) and Without
(Bottom) Covers Removed..................................................................................................................47
Figure 54 – Siemens PLC Wiring Scheme ....................................................................................48
Figure 55 – Schneider LC1 D25 Relay, Control Cabinet ........................................................49
Figure 56 – TB 1 Terminal Block, Installation Wiring, Control Cabinet.........................50
Figure 57 – TB 1 Terminal Block, Factory Wiring, Control Cabinet.................................51
Figure 58 – TB 2 Terminal Block, Factory Wiring, Control Cabinet.................................52
Figure 59 – TB 2 Terminal Block, Installation Wiring, Control Cabinet.........................53
Figure 60 – Momentary On/Off Operation Switch, Wired at Factory, Control Cabinet
.........................................................................................................................................................................54
Figure 61 – Momentary Switch in OFF or Neutral Position.................................................55
Figure 62 – Momentary Switch in Up (Raise) Gate or Barrier Plate................................55
Figure 63 – Momentary Switch for DOWN or Lower Gate or Barrier Plate .................55
Figure 64 – Left Side Electrical Schematic, Control Cabinet................................................56
Figure 65 – Right Side Electrical Schematic, Control Cabinet.............................................57
Figure 66 – Entire Electrical Schematic, Control Cabinet.....................................................58
Figure 67 – Motor/Pump and Fluid Reservoir, Control Cabinet .......................................59
Figure 68 – Manual Operating Switch Location........................................................................61
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...