Spike Systems: PBG System Family Installation
43
Figure 49 – Traffic Control Signal Wiring
Tool Required
Tool Type
Tool Specification
Screw Driver
Flat, Small
Wire Strippers
If required for cable
connection
3.7 Wiring for Remote Operating Switch (Guard Shack, Typically)
As indicated in the figure below, a field connection barrier operated switch or
control is wired to TB2. The Common wire is attached to terminal 4, the Open wire is
attached to terminal 5, and the Close wire is attached to terminal 6
.
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...