Spike Systems: PBG System Family Installation
40
WARNING -‐-‐
When servicing the system, this switch should be placed in the OFF position
and the power going to the junction box should be shut off at the breaker box. When AC
power is OFF at this switch and breaker box, voltages may still be present within the Spike
System Control Box. Use caution.
Figure 44 – AC Power Junction Box Inside Control Cabinet
Tool Required
Tool Type
Tool Specification
Flexible Conduit
To connect power
conduit stub-‐up to 4
gang box
Conduit Fitting
To connect flexible
conduit to client-‐
installed rigid conduit
Flat Blade Screw
Driver
To open junction box
and terminate power
cables
Wire Strippers
To make electrical
connection (Licensed
contractor)
The figure below shows a typical routing of the flexible conduit that will provide power to
the PBG system. A locally licensed electrical contractor should perform electrical power
connection to the Spike System.
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...