Spike Systems: PBG System Family Installation
33
Make sure that the hydraulic hoses are not kinked anywhere and do not rub against any
sharp edges inside the Control Cabinets and the PBG Track.
3.2 Installation of Concrete Anchors
3.2.1 System View Prior to Anchor Installation
Before concrete anchors are installed, the PBG system should resemble the figure below.
Figure 34 -- System View Prior to Anchor Installation
Make adjustments as needed to ensure that both cabinets are ½” from the Plate on
both sides prior to anchoring
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...