Spike Systems: PBG System Family Installation
ii
4.3.5 On-‐Going Maintenance Tasks: Hydraulic Pump .................................................................. 64
4.4 Possible Field Repair Tasks .................................................................................................64
4.4.1
Plate Replacement ............................................................................................................................ 64
4.4.2 Clevis Installation, Non-‐Control Cabinet................................................................................. 66
4.4.3 Clevis Installation, Control Cabinet........................................................................................... 67
4.4.4 Hydraulic Cylinder Installation, Control and Non-‐Control Cabinet ............................ 68
4.5 Maintenance Reference Information................................................................................69
Appendix A -‐ Warranty........................................................................................................75
Appendix B – Optional Inductive Loop Vehicle Detector Installation.................77
B.1 Inductive Loop Vehicle Detector (Saw Cut Control Loop) General Guidelines...77
B.2 Inductive Loop Vehicle Detector (Saw Cut Control Loop) Relay Connection......78
Appendix C -‐ General Safety...............................................................................................81
C.1 General Safety Considerations ............................................................................................81
C.2 Safety Signs ................................................................................................................................81
Figures
Figure 1 -‐-‐ PBG-‐100 As Installed and Dimensions for Installation Planning ...................4
Figure 2 – PBG Product Family Major Component Identification.........................................5
Figure 3 – PBG-‐120 Universal Layout and Configuration.........................................................6
Figure 4 – PBG-‐100 RH DB (Right Handed, Double Buttress)................................................7
Figure 5 -‐-‐ PBG-‐120 LH DB (Left Handed, Double Buttress)...................................................8
Figure 6 -‐-‐ PBG-‐120 RH DB (Right Handed, Double Buttress) ...............................................8
Figure 7 -‐-‐ PBG-‐120 RH DB (Right Handed, Double Buttress) ...............................................9
Figure 8 -‐-‐ PBG-‐160 LH DB (Left Handed, Double Buttress)................................................10
Figure 9 -‐-‐ PBG-‐100 LH SB (Left Handed, Single Buttress)...................................................11
Figure 10 -‐-‐ PBG-‐100 LH-‐RH DB (Left & Right Handed, Double Buttress) ....................12
Figure 11 -‐-‐ PBG-‐100 LH-‐RH DB (Left & Right Handed, Double Buttress) ...................13
Figure 12 -‐-‐ Control and Non-‐Control Cabinets Secured to Shipping Pallet..................15
Figure 13 – Inner Panel Removal from Control and Non-‐Control Cabinets ..................17
Figure 14 – Temporary Placement of Control Cabinet to Mark Location of..................19
Figure 15 – Inductive Loop Vehicle Detector (Saw Cut Loop) Beneath Cabinet .........20
Figure 16 – Placement of the Plate on the Ground, Propped Up ........................................21
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...