Spike Systems: PBG System Family Installation
iii
Figure 17 – Wood Blocks Used Under the Plate, 3 Locations (1 of 3)..............................22
Figure 18 – Wood Blocks Used Under the Plate, 3 Locations (2 of 3)..............................22
Figure 19 – Wood Blocks Used Under the Plate, 3 Locations (3 of 3).............................23
Figure 20 -‐-‐ Locate Control Cabinet near the Plate and Hinge for Installation............24
Figure 21 – Placement of Control Cabinet Relative to Client Installed Conduit ..........24
Figure 22 -‐-‐ Locate Non-‐Control Cabinet near the Plate and Hinge for Installation..25
Figure 23 -‐-‐ Secure Hydraulic Cylinder to Plate, 2 sides........................................................26
Figure 24 -‐-‐ Hardware for Mounting Hydraulic Cylinders....................................................26
Figure 25 – Hydraulic Hose Location, As Shipped, Inside Control Cabinet ..................27
Figure 26 – Two Hoses Routed Through Track to Non-‐Control Cabinet.......................28
Figure 27 – Pulling Two Hydraulic Hoses Through PBG Control Cabinet......................28
Figure 28 – Two Hoses Routed to Non-‐Control Cabinet .......................................................29
Figure 29 – Placing Track in Position Above Hoses. ................................................................29
Figure 30 – Minor Positional Adjustments .................................................................................30
Figure 31 – Hydraulic Hose Connection, Non-‐Control Cabinet..........................................31
Figure 32 – Hydraulic Hose Connection, Control Cabinet....................................................32
Figure 33 – Hydraulic Hose Connection, Non-‐Control Cabinet..........................................32
Figure 34 -‐-‐ System View Prior to Anchor Installation...........................................................33
Figure 35 – Adjust Cabinet Locations to Ensure ½” Gap between Plate and Cabinets
.........................................................................................................................................................................34
Figure 36 – Hilti Concrete Anchor Bolt (4” x 5/8”) .................................................................34
Figure 37 – Drilling Pilot Holes for Concrete Anchors............................................................35
Figure 38 – Cleaning Pilot Holes After Drilling .........................................................................36
Figure 39 – Secure Anchors with Wrench for Final Attachment........................................36
Figure 40 – View of Upper and Lower Limit Switches, Control Cabinet........................37
Figure 41 – Location of Upper Limit Switch, Control Cabinet ............................................38
Figure 42 – Location of Lower Limit Switch, Control Cabinet, Reference Only..........38
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...