
Spike Systems: PBG System Family Installation
64
4.3.5 On-‐Going Maintenance Tasks: Hydraulic Pump
WARNING:
BEFORE YOU USE A MATERIAL, REFER TO THE
MANUFACTURES’ MATERIAL SAFETY DATA SHEETS FOR
SAFETY INFORMATION. SOME MATERIALS CAN BE
DANGEROUS.
Scheduled Maintenance
Period
Maintenance
Daily
Check HPU manifold for leakage.
Weekly
Check HPU reservoir fluid level.
Semi-Annually Change hydraulic fluid (heavy use).
Annually
Change hydraulic fluid (moderate use).
Material Part Numbers
Description
Brand
Part No.
Quantity
Hydraulic
Fluid
DEXRON III ATF Fluid
HO-2
3 Liters
4.4 Possible Field Repair Tasks
The following sections provide information on possible field replacement tasks that may
be required. When the Spike System is initially shipped, these tasks have already been
completed by the factory. These instructions will aid the client maintenance staff repair
and replace certain items should they become damaged during normal system
operation
4.4.1
Plate Replacement
If it is ever necessary to attach a new Plate to the hinge assembly, use the following as a
guideline for attaching the two components.
Summary of Contents for PBG Series
Page 8: ...Spike Systems PBG System Family Installation vi...
Page 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Page 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Page 68: ......
Page 82: ...Spike Systems PBG System Family Installation 74...
Page 84: ......
Page 90: ...Spike Systems PBG System Family Installation 82...
Page 91: ...Spike Systems PBG System Family Installation 83...
Page 92: ...Spike Systems PBG System Family Installation 84...
Page 93: ...Spike Systems PBG System Family Installation 85...
Page 94: ...Spike Systems PBG System Family Installation 86...