Commissioning
5.3 Procedure for commissioning with STARTER
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A
201
The STARTER project wizard
Figure 5-3
STARTER project wizard
⇒
Click Arrange drive units offline... in the STARTER project wizard.
Figure 5-4
Create new project
⇒
Enter a project name and, if necessary, the author, memory location and a comment.
⇒
Click Continue > to set up the PG/PC interface.