Commissioning
5.3 Mount the oil expansion unit
BA 2030
Operating Instructions, 02/2021, A5E37880173A/RS-AM
59
Procedure
1.
Assemble the mounting kit
①
-
⑤
.
2.
Screw on the unit with the screwed connection
⑤
at the uppermost drill hole of the gearbox
housing or of the motor bearing shield.
3.
Align the oil expansion tank so that it is, as far as possible, in the vertical position. Aligning it
at an angle of ±45° to the vertical is permissible if space is restricted.
Oil expansion unit size 109 - 189
NOTICE
Hose with leaks
The hose of the oil expansion unit is subject to a natural aging process.
Check the hose for tears or leaks.
Never commission a leaky hose. Replace the hose, if necessary.
The hose of the oil expansion unit is not suitable for ambient temperatures below -25° C.
If the ambient temperatures differ, contact Technical Support.
The unit is supplied as a mounting kit. The installation is described in the supplied Compact
Installation Instructions KA 2530-1.
Figure 5-3
Example of an oil expansion unit size 109-189
Summary of Contents for SIMOGEAR BA 2030
Page 1: ......
Page 2: ......
Page 68: ...Operation BA 2030 66 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 72: ...Faults causes and remedies BA 2030 70 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 104: ...Disposal BA 2030 102 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 206: ...Your suggestions BA 2030 204 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 207: ......
Page 208: ......