BA 2030
Operating Instructions, 02/2021, A5E37880173A/RS-AM
57
Commissioning
5
5.1
General information for commissioning
WARNING
Unintentional starting of the drive unit
Secure the drive unit to prevent it from being started up unintentionally.
Attach a warning notice to the start switch.
WARNING
Risk of slipping on oil
Remove any oil spillage immediately with an oil-binding agent in compliance with
environmental requirements.
Checking the pressure breather valve
Check that the breather valve is activated.
If the breather valve has a transport fixture, it must be removed before commissioning.
Figure 5-1
Pressure breather valve with securing clip
Remove the transport fixture by pulling the securing clip
①
in the direction of the arrow.
5.2
Checking the oil level prior to commissioning
Check the oil level before commissioning. Correct the oil quantity when required.
Siemens AG recommends a complete oil change after a storage time longer than 24 months:
•
For gearboxes with long-term preservation.
•
For gearboxes supplied completely filled with oil.
Please observe Checking and changing lubricants (Page 74).
Summary of Contents for SIMOGEAR BA 2030
Page 1: ......
Page 2: ......
Page 68: ...Operation BA 2030 66 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 72: ...Faults causes and remedies BA 2030 70 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 104: ...Disposal BA 2030 102 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 206: ...Your suggestions BA 2030 204 Operating Instructions 02 2021 A5E37880173A RS AM ...
Page 207: ......
Page 208: ......