
Page 30
SITRANS LG200 – INSTRUCTION MANUAL
7ML19985KA02
Inst
allat
ion
Installing the probe
Coaxial probe
1.
Make sure the process connection is at least ¾” NPT or a flanged mounting.
2.
Carefully place the probe into the vessel. Align the gasket on flanged installations.
3.
Align the probe process connection with the threaded or flanged mounting on the
vessel.
4.
For threaded connections, tighten the hex nut of the probe process connection. For
flanged connections, tighten flange bolts.
Twin Rod Probe (Rigid)
1.Make sure the process connection is at
least 2" NPT or a flanged mounting.
2.Make sure that there is at least 25 mm (1")
spacing between the active probe rod and
any part of the tank (walls, still-well, pipes,
support beams, mixer blades, etc.). Minimum
stillwell or nozzle diameter for Twin Rod
probe is 80 mm (3").
3.Carefully place the probe into the vessel.
Align the gasket on flanged installations.
4.Align the probe process connection with the
threaded or flanged mounting on the vessel.
5.
For threaded connections, tighten the hex nut of the probe process connection. For
flanged connections, tighten flange bolts.
6.
Probe can be stabilized by attaching the inactive probe rod to vessel.
inactive
probe
rod
active
probe
rod
min.
25 mm
(1")
Summary of Contents for 7ML1301-1
Page 1: ...Instruction Manual February 2009 LG200 sitrans ...
Page 10: ...Page 6 SITRANS LG200 INSTRUCTION MANUAL 7ML19985KA02 SITRANS LG200 Notes ...
Page 59: ...7ML19985KA02 SITRANS LG200 INSTRUCTION MANUAL Page 55 SIMATIC PDM ...
Page 60: ...Page 56 SITRANS LG200 INSTRUCTION MANUAL 7ML19985KA02 SIMATIC PDM Notes ...
Page 96: ...Page 92 SITRANS LG200 INSTRUCTION MANUAL 7ML19985KA02 Hazardous Installation ...