Chapter
4
Operating Instructions
AFS60/AFM60 EtherNet/IP
38
Commissioning
4
Commissioning
This chapter provides information on the electrical installation, configuration and commis-
sioning of the AFS60/AFM60 EtherNet/IP Absolute Encoder.
Please read this chapter before mounting, installing and commissioning the device.
4.1
Electrical installation
Switch the power supply off!
The machine/system could unintentionally start up while you are connecting the devices.
Ensure that the entire machine/system is disconnected during the electrical
installation.
For the electrical installation you will need connection plugs and sockets (see the data
sheet of the AFS60/AFM60 EtherNet/IP).
WARNING
© SICK AG• Germany • All rights reserved
8018909/1EH9/2021-12-16
Subject to change without notice