![Shimadzu GC-2014 Instruction Manual Download Page 59](http://html1.mh-extra.com/html/shimadzu/gc-2014/gc-2014_instruction-manual_1256914059.webp)
47
4.1
4
.
4
.
GC-2014
4 Installing Capillary Columns and Setting Analytical Flow Lines
4.1
Installation Location for Capillary Columns
Injection ports and detectors for capillary columns can be installed in positions described in
Table 4.1.1 and Fig. 4.1.1.
(Injection ports and detectors that can be used for packed columns are included.)
Table 4.1 Installation location for injection ports/detectors for capillary columns
Installation location numbers indicate the positions of column connecting joints.
Name
Possible installation location
Injection ports
SPL
1, 4
WBI
1, 4
Dual INJ
1-2, 2-3, 3-4
Single INJ
1, 4
Detectors
Dual FID
6-7
Single DET
5, 6, 7, 8
FTD-2014c
11, 12
TCD
9-10
Fig. 4.1.1
Installation location for injection ports/detectors for capillary columns
(layout viewed from the top of the unit)
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...