14 Diagnosis
14.5 Standard Installation Test
193
GC-2014
14.5.3
Test procedure
(1) Specify the analytical conditions file of the standard installation test.
Example: Load “File 1” using [File] (PF menu) of the [SET] key.
(2) Configure the injection port and the detector used to execute the standard installation
test in an analytical here.
However, if two or more analytical lines have been configured, the lowest No. analytical
line is set with the test conditions.
In the standard installation test, only one detector can be set per analytical line. If two or
more detectors are set, an error message appears.
(3) Set the dimensions of the column installed.
Example: Set the dimensions of the column using [Column] of the [FLOW] key.
(4) Press [Load] (PF menu) to load the analytical conditions of the standard installation test.
(5) If the analytical condition need to be changed for the installation test, change the
parameters.
(6) Make an injection, then verify whether the data has been acquired correctly.
(7) When analysis finishes, press [Unload] (PF menu) to return the analytical conditions to
their former status.
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...