![Shimadzu GC-2014 Instruction Manual Download Page 55](http://html1.mh-extra.com/html/shimadzu/gc-2014/gc-2014_instruction-manual_1256914055.webp)
3 Installing Packed Columns and Setting Analytical Flow Lines
3.5 Packed Analysis Using the Single DET
43
GC-2014
■
Procedures to move the dual INJ
Move the dual INJ following the procedures below. Perform backward processes to return it
to its original position.
(1) Set the dual INJ temperature at room temperature or lower and wait until it becomes
40 °C or less.
(2) Turn OFF the power of the GC unit.
(3) Remove the column connected to the dual INJ.
(4) Detach wiring connected to the dual INJ in order to improve workability.
(5) Unfasten the three screws that fasten the dual INJ (Fig. 3.5.2 (a)) and pull the dual INJ
upward.
(Sems screws with a flat washer are used. Be careful not to drop flat washers.)
(6) Take out the heat insulator laid on the bottom of the dual INJ using tweezers or other
similar tools.)
WARNING
Carry out the procedures after the injection port becomes 40 °C or
less to prevent burns.
CAUTION
Some insulation materials include ceramic fibers.
Refer to “When Handling Insulation” of “Introduction” in the GC-2014
Operation manual before you handle these materials.
CAUTION
When cutting a heat insulator, handle a cutting knife, etc. with care.
Fig.3.5.2 (a)
Screws (sems flat washers)
Single DET
Dual INJ
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...