![Shimadzu GC-2014 Instruction Manual Download Page 251](http://html1.mh-extra.com/html/shimadzu/gc-2014/gc-2014_instruction-manual_1256914251.webp)
16 Special Functions
16.6 GC Configuration
239
GC-2014
16.6.6
Setting the Ready Check Parameters
The Ready Check verifies whether the preset analytical conditions have been met.
When the selected items reach the specified settings, the STATUS light illuminates.
16.6.6.1
Screen description
Select “6. GC CONFIGURATION” from the [FUNC] key screen, and then select “4.
READY CHECK”, to display the ready check screen shown in Fig.16.6.5.
Set each parameter to “yes” or “no”. All parameters with “yes” must reach their initial
parameter starts in order for the GC to be ready and the STATUS light to turn green.
16.6.6.2
Parameter list
HEATER PORT
TEMP
Selection: Yes/No, Default: Yes
Indicate which headed zones should be included in the ready check.
CARRIER GAS
Selection: Yes/No, Default: Yes
SEPTUM PURGE
Selection: Yes/No, Default: Yes
Indicate which injection port septum purge flow lines should included in the check.
The displayed items depend on the injection port type.
DET FLOW GAS
MAKE UP
Selection: Yes/No, Default: Yes
HYDROGEN
Selection: Yes/No, Default: Yes
Fig. 16.6.5
Ready Check setup screen
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...