![Shimadzu GC-2014 Instruction Manual Download Page 50](http://html1.mh-extra.com/html/shimadzu/gc-2014/gc-2014_instruction-manual_1256914050.webp)
3 Installing Packed Columns and Setting Analytical Flow Lines
3.3 Single-Column Packed FID Analysis
38
GC-2014
3.
Set the dual FID.
(1) Press the [DET] key.
(2) Set “Control mode” as described below.
Set to “Single L” when the column is connected to the left (L) side of the dual FID and “Single
R” when it is connected to the right (R) side.
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...