
(6) Paper-feed torque limiter
500-sheet cassette brake spring
(7) Optical rail
Note 1: Grease (Molycoat (UKOG-0062FCZZ) or White Molycoat
(UKOG-0158FCZZ) ) must be applied to the correct grease
points of each gear. Do not use too much grease.
Note 2: No grease shall be applied inside the gear of the magnetic
clutch.
5. Maintenance Schedule of Options
Maintenance of options must be done during that of the machine.
Maintenance of SF-D23/SF-DM11 is as follows:
•
Duplex unit:
Perform Simulation 22-9 to read out data in the
duplex counter, and conduct maintenance on the
basis of the data.
•
Desk:
every 80,000 sheets of copy paper.
Maintenance of RADF/ADF is as follows:
Perform Simulation 22-08 to check the contents of the RADF/ADF
copy counter, and then conduct maintenance every 80,000 sheets of
copy paper.
★
= lubrication
F
= cleaning
v
= adjustment
b
= replac-
ing/mounting
✕
= check(cleaning, replacing and/or adjustment, if
necessary),
k
= repositioning
Torque limiter
500-sheet cassette brake spring
9 – 7
Summary of Contents for SF-2040
Page 27: ...9 Desk unit SF D23 11 12 16 17 13 18 10 9 8 7 6 2 5 4 3 1 23 21 22 19 20 14 15 4 10 ...
Page 63: ...5 5 C F 10 D 7 6 11 G E 8 9 H 12 6 2 ...
Page 65: ...3 B 3 E 13 C 4 5 6 7 8 F 14 D 10 11 9 6 4 ...
Page 67: ...2 1 3 A D 9 8 11 10 B 4 5 E 12 13 14 C 7 6 6 6 ...
Page 69: ...A a 1 1 D 4 4 B 1 b 1 1 E 5 5 7 6 8 9 8 5 C 2 3 3 F 5 11 12 6 8 ...
Page 71: ...1 2 3 3 4 5 A D 13 11 10 7 6 6 7 B E 14 8 12 9 C F 15 G 16 16 6 10 ...
Page 73: ...A a 1 D 11 10 10 9 8 B 4 2 3 E 13 12 12 C 5 7 6 7 6 12 ...
Page 75: ...C 4 F 9 9 9 10 9 5 6 D G 11 E 8 7 6 14 ...
Page 78: ...Volume PWB 8 9 10 10 6 17 ...
Page 80: ...C 5 F 11 P D F R 7 6 6 12 13 G 12 13 E 8 9 a 8 H 14 6 19 ...