Generating set start-up
Screen
No.
Screen Data
displayed
G 6
STARTING
IN PROGRESS
24/08/2005
13:12
Operating phase - genset starting
Date and time (depending on settings)
G 7
AIR PREHEATING
10sec
24/08/2005
13:12
Operating phase - air preheating prior to genset
starting
Countdown of the air preheating delay
Date and time (depending on settings)
Generating set started
Screen
No.
Screen
Data displayed
G 8
Default
screen
AVAILABLE POWER
75%
24/08/2005
13:12
Operating phase – genset operating – stable voltage
and frequency
Available power
Date and time (depending on settings)
G 9
AUTOMATIC STOP
IN PROGRESS
LOAD SUPPRESSION
1min30
24/08/2005
13:12
Operation mode - operation in AUTO mode
Power supply device opens (motorised circuit
breaker or changeover switch controlled by the
TELYS)
Countdown of the Mains Return delay OR Test on
load delay
Date and time (depending on settings)
73/242
Summary of Contents for R33C3
Page 2: ......
Page 94: ...92 242 ...
Page 95: ...10 Appendix 10 1 Appendix A Engine user and maintenance manual 93 242 ...
Page 96: ...94 242 ...
Page 98: ...96 242 ...
Page 115: ...113 242 ...
Page 135: ...133 242 ...
Page 145: ...143 242 ...
Page 179: ...177 242 ...
Page 191: ...July 2009 Pub No 99610 29120 OPERATION MAINTENANCE MANUAL 189 242 ...
Page 192: ...Printed in Japan Pub No 99610 29120 190 242 ...
Page 193: ...10 2 Appendix B Alternator user and maintenance manual 191 242 ...
Page 194: ...192 242 ...
Page 196: ...194 242 ...
Page 227: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 225 242 ...
Page 242: ...14 LEROY SOMER 2010 11 f Installation and maintenance R438 NOTES 3971 en 240 242 ...
Page 243: ...LEROY SOMER 15 2010 11 f Installation and maintenance R438 NOTES 3971 en 241 242 ...