3-4
Chapter 3 OPERATION
Starting
The starting method changes based on the application and specifications.Start the engine according to the specified
procedure.
Warm up operation
After the engine starts, operate the engine in a no load condition at low idling speed for 5 to 10 minutes to warm up
the engine.
Checking engine oil pressure
During warm up operation, check if the oil pressure is
in the range of standard value (0.15 MPa {1.5 kgf/cm
2
}
[21 psi] or more).
Also, make sure the oil pressure gauge is operating
properly.
Note: The oil pressure gauge may indicate a higher
level than normal level immediately after the en-
gine starts, due to the low oil temperature. The
pressure gradually lowers to the normal level as
the oil temperature rises.
External inspection during warm up
Visually check the external view of the engine for fuel,
engine oil and coolant leakage, or exhaust gas leak-
age from joints.
Before starting the engine, check to make sure no one is near the engine and that tools are not left on or near the
engine.In a loud voice, notify people in the area when starting the engine.
Do not apply a load to the engine at starting. (Disengage the clutch if installed.)
Continuous operation of the starter will drain the battery power and cause the starter to seize. Do not use the
starter for more than 10 seconds at a time. When the engine does not start, wait for more than one minute before
cranking again.
Do not approach rotating parts during operation. Entanglement by rotating parts can cause serious injury.
137/242
Summary of Contents for R33C3
Page 2: ......
Page 94: ...92 242 ...
Page 95: ...10 Appendix 10 1 Appendix A Engine user and maintenance manual 93 242 ...
Page 96: ...94 242 ...
Page 98: ...96 242 ...
Page 115: ...113 242 ...
Page 135: ...133 242 ...
Page 145: ...143 242 ...
Page 179: ...177 242 ...
Page 191: ...July 2009 Pub No 99610 29120 OPERATION MAINTENANCE MANUAL 189 242 ...
Page 192: ...Printed in Japan Pub No 99610 29120 190 242 ...
Page 193: ...10 2 Appendix B Alternator user and maintenance manual 191 242 ...
Page 194: ...192 242 ...
Page 196: ...194 242 ...
Page 227: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 225 242 ...
Page 242: ...14 LEROY SOMER 2010 11 f Installation and maintenance R438 NOTES 3971 en 240 242 ...
Page 243: ...LEROY SOMER 15 2010 11 f Installation and maintenance R438 NOTES 3971 en 241 242 ...