Reading the
manual for the
equipment is
compulsory
Wearing suitable
protective clothing
is compulsory
Wearing suitable
protective goggles
and ear defenders
is compulsory
Lifting point
required
Forklift required for
lifting
Battery charge
must be checked
Periodic
maintenance
compulsory
Figure 3 :
Pictograms indicating compulsory operations
Earth
Battery isolating
switch
External fuel
connections
Diesel fuel
Drain the fuel
Inspection flap
Fill the coolant
Drain the coolant
Mains supply
connection
prohibited before
filling with water
Fill the oil
Drain the oil
Retention container
high level
Drain the retention
container
Figure 4 :
Information pictograms
6/242
Summary of Contents for R33C3
Page 2: ......
Page 94: ...92 242 ...
Page 95: ...10 Appendix 10 1 Appendix A Engine user and maintenance manual 93 242 ...
Page 96: ...94 242 ...
Page 98: ...96 242 ...
Page 115: ...113 242 ...
Page 135: ...133 242 ...
Page 145: ...143 242 ...
Page 179: ...177 242 ...
Page 191: ...July 2009 Pub No 99610 29120 OPERATION MAINTENANCE MANUAL 189 242 ...
Page 192: ...Printed in Japan Pub No 99610 29120 190 242 ...
Page 193: ...10 2 Appendix B Alternator user and maintenance manual 191 242 ...
Page 194: ...192 242 ...
Page 196: ...194 242 ...
Page 227: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 225 242 ...
Page 242: ...14 LEROY SOMER 2010 11 f Installation and maintenance R438 NOTES 3971 en 240 242 ...
Page 243: ...LEROY SOMER 15 2010 11 f Installation and maintenance R438 NOTES 3971 en 241 242 ...