SAMWONTECH
2nd Edition of TEMP2000M_Series IM : April. 8. 2014 Page 10 / 176
1.2.4.2 How to install control part
▶
In case of installing DIN rail
1) DIN rail preparation
2) Insert the ⓐ part on the main unit and sub unit into the rail first as shown in the picture and
push ⓑ part and the installation shall be made the latch to lock into the rail as shown in the picture.
3) Assemble the installed main unit and sub unit to the direction of arrow as shown in the following
picture.
35
1
7.3
27
ⓑ Push
BACK COVER
ⓐ
Latch
Summary of Contents for 3ch series
Page 1: ...Instruction Manual ...