SAMWONTECH
2nd Edition of TEMP2000M_Series IM : April. 8. 2014 Page 55 / 176
PROGRAM RUN START
▶
PROGRAM OPERARTION START is done according to the setting of STC (START CODE)
setup.
(1)
Setting Point Preferred Program Operation (STC = SSP)
▶
When program operation starts, SP starts from SSP and operates until SP1 under 1SEG for set Time
1(TM1).
(2)
Slope Preferred Program Operation (STC = S.PV)
▶
When program operation starts Setting Point(SP) starts from the present Process Value(PV) and
operates until Setting Point 1(SP1) under SEG1. Based on the contents of program patten, remaining
time is calculated as time is passed till operation starting point.
①
When Segment 2 is the first maintaining section.
②
When Segment 3 is the first maintaining section
③
When there is no maintaining section
SSP
TM1
TM2
SP1
a
b
c
d
e
Present
Pointing Value
Program
Operation Start
C
C
C
D
E(SSP)
a
b
c
d
e
Present
Pointing Value
Program
Operation Start
A
B
C
D
E(SSP)
a
b
c
d
e
Present
Pointing Value
Program
Operation Start
A
B
C
D
E(SSP)
a
d
e
E
D
C
B
A
b
c
a
d
e
E
D
C
B
A
b
c
a
d
e
E
D
C
B
A
b
c
1
2
3
4 Segment
1
2
3
4 Segment
1
2
3
4 Segment
Summary of Contents for 3ch series
Page 1: ...Instruction Manual ...