LED R&D Lab(VD)
70
- Cabling guide (BRIDGE-BOX – S-BOX, HDBT connection)
S-BOX(SNOWAAE)
1
2
1. Insert HDBT cable into BRIDGE BOX.
2. VERTICAL FRAME Escape shape, turn the cable to the right.
3. Arrange cables by using a fixed hanger shape.
※ S
-BOX Connection IG / Bridge Box Specification
(SNOWAAE, External IR/ECO & BT/WIFI )
5. C Frame installation