LED R&D Lab(VD)
72
※ Step 1 If the last CABINET is the even number, connect by installing I/G on the side frame of the last CABINET.(Fig.1).
※ If the last CABINET in the first stage is an odd number, I/G is installed on the side frame of the last CABINET in the top
to
connect.(Fig.2)
※ For more information on IG location, refer to Chapter 9 Power and Cable Connection.
1
even
I/G
B/BOX
I/G
Fig.1 I/G placement when the last is an even numbered CABINET
Fig.2 I/G placement when the last is an odd-numbered CABINET
1
odd
I/G
B/BOX
I/G
last
◇
CABINET installation
(IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. C Frame installation
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...