LED R&D Lab(VD)
55
4. Frame installation
②
ASSY FRAME H DOUBLE and SINGLE (different according to the 3X3/4X4/5X5 specification) are extended by using the
connected JOINT H
-
Connect two FRAME H without screw, Pay attention to the guide engraving position.
(Fig.1)
* The screw fastening is carried out in the next step.
-
Extended by combining FRAME H according to the installation specifications, and the last JOINT H is used only for extended installation (Fig.2)
Fig.1 ASSY FRAME H extension
Note the guide position
+
+
+
+
X 2
X 2
X 2
Fig.2
ASSY FRAME H extension (changed according to the specification, when installing alone, the last JOINT H is separated)
3X3 : Double 2 + Single 2
4X4 : Double 4
5X5 : Double 4 + Single 2
ASSY FRAME H SINGLE(1
st
stage)
ASSY FRAME H DOUBLE(2
nd
stage)
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...