LED R&D Lab(VD)
205
Push the plastic loader as close as possible: Push the plastic load bar as close as possible to the cable.
Cut all the wires leaving about 0.5” with a wire cutter.
Ground is reinforced using drain wire. (refer to next page)
※ Without drain wire: Reinforced by contacting the connector shell as shown below using copper foil
Copper foil
Fold Al foil or Braid back and wrap it with Copper foil
Connector shell
Drain wire
• S-Box Connection
⑨
Finishing method for HDBase-T Cable
Appendix 2 - S-Box Installation and Connection
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...