LED R&D Lab(VD)
208
•
Recommended to install in 19 inch Server rack
• When using the Multi Link HDR function
Multi Link HDR Port
Multi Link HDR Port
①
The rubber stopper of the Multi Link HDR Port is open.
②
Connect the connector of the Multi Link HDR Cable (sold
separately) to the Multi Link HDR Port of each S-
Box (※ Caution:
Connect the connector structure facing up)
③
Menu-Picture-LED HDR-Multi Link HDR Settings-ON
④
Setting the number of connected S-Box (2/3/4)
⑤
S-
Box ID Setting (※ Caution: It is necessary to set the ID so that ID
does not overlap between connected S-Boxes)
UP
SIDE
(Only for SBB
-
SNOWJMU)
Appendix 2 - S-Box Installation and Connection
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...