LED R&D Lab(VD)
206
•
Drain wire is combined on the cable jacket as shown in the figure below using pliers.
•
Soldering the drain wire to the metal part of the RJ45 connector: After soldering the drain wire to the metal part of
the RJ45 connector, cut off unnecessary parts. Conductors and shield continuity check with cable tester.
⑩
Finishing method for HDBase-T Cable
Recommended) Drain wire sol Copper foil
• S-Box Connection
Appendix 2 - S-Box Installation and Connection
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...