LED R&D Lab(VD)
134
1. Product Information and Installation Precautions
2. Preparation for Cabinet Installation
3. Frame Kit Components
4. Frame Installation
5. C Frame Installation
6. Frame Bezel Components
7. Frame Bezel Installation
8. S-Box Installation and Connection
9. Connections – Power and Signal
10. Settings / How to Use
Appendix 1 – S-Box Network IP Setting
Appendix 2 – S-Box SNOWJ*U Setting
Contents
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...