LED R&D Lab(VD)
60
4. Frame
설치
- Move and assemble two upper/lower STUDs assembled in the FRAME VERTICAL LEFT. (Fig.2)
* As shown in the figure, make sure to move both the upper and lower STUDs. (Fig.3)
* Adjust both FRAME VERTICAL LEFT and RIGHT can be adjusted up to 1.0mm.
* If it is installed on the wall, adjust the amount of wall-mounted screw fastening so that the right FRAME KIT can be moved.
- Reassemble the BRACKET-SUPPORT using screws (BH,M4,L6) in the ASSY FRAME VERTICAL. (Fig.4)
- Fix ASSY FRAME H using SCREW (FH,M4,L6) (Fig.5)
BEFORE
Fig.2 STUD location Movement
Fig.4 Assemble the Bracket-Support with screws
AFTER
BEFORE
AFTER
Fig.5 Fasten the screw to fix the FRAME H
Fig.3 Check the STUD position
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...