LED R&D Lab(VD)
100
10. Using two M3, L5 screws each, fasten it to the frame bezel top boot.
(Fig. 1)
* When a gap occurs in the middle of the bezel, attach a sheet bezel so that the gap is not visible
from the front. (Depending on the degree of separation, the number of sheet bezels is successively
added to complement.)
11. Using 6 M4, L8 screws, connect the frame bezel top bottom and the top hole of the cabinet
(Fig. 2).
M4,L8
[Fig.1]
[Fig.2]
M3,L5
Sheet Bezel
7. Frame Bezel installation
◇
Bezel installation
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...