LED R&D Lab(VD)
92
2. Sensor Bottom and Bluetooth/WiFi are divided into IG #1 / #2 and installed in advance. (Bezel installation)
① I/G 1 is installed from the bottom of the first screen on the left → Bridge Box connection (
WiFi / BT)
②
I/G 2 is installed at the Bottom
of the right screen → Connect the light sensor
7. Frame Bezel installation
◇
Bezel installation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Bridge BOX
Bluetooth/Wi-Fi
I/G #1
I/G #2
SENSOR BOTTOM
(IR/Light sensor)
※ IR /
Light sensor can not be used by connecting more than one
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...