LED R&D Lab(VD)
2
Revision History
Version
Date (Y/M/D)
Description
2.6
2022/02/11
Max number of power daisy chain is changed because of docking connector limitation.
Only power connection from docking can be cut by physical switch externally.
2.7
2022/02/15
Update AC Power Cord, cable and OCM cable were removed.
2.8
2022/02/24
Max number of power daisy chain is changed because of docking connector limitation.
Only power connection from docking can be cut by physical switch externally.
3.0
2022/03/03
Modify contents of screw for UL corresponding structure and screw for y-axis adjustment.
(change of Assy Accessory screw components) (p.26-27, p38, p42, p63)
3.1
2022/03/07
Add mandatory confirmation guide before installation (p9)
3.2
2022/04/13
Add Cable Only Connection (for the case of single level installation) (P.29)
3.3
2022/04/21
Modify Max number of power connection
3.4
2022/05/12
Modify edge protection code (BN81-17515A->B) (P.27)
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...