LED R&D Lab(VD)
79
⑦
After the first stage installation is finished, from the second stage, install the upper and lower
docks without cables in the same direction.
Be sure to remove the attached protective sheet before installing the common surface.
※ When docking up and down, the horizontal shared surface must be assembled, but the shared surface is inserted between the
front and the frame (Fig. 1).
※ After assembling the shared surface, fix it with FH screw.(Fig. 2)
※ Install docking in the same way as 3, 4, 5, 6 levels.
Fig.1 Assembling the horizontal shared plane
Fig.2 Fixed with shared face screw
FRAME
FRONT
◇
CABINET installation
(IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. C Frame installation
SCREW-MACHINE
(FH, M4, L10)
Protective Sheet
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...