LED R&D Lab(VD)
83
⑩
After installing the CABINET, fix the X-axis position by fastening the screw on the side and
the Z-axis position using a magnet.
※ Connect the outermost 2 points of the CABINET (Fig. 1)
※ A magnet is attached to fix the Z
-axis of the surface where the CABINETs meet (Fig. 1).
1
2
3
4
7
8
9
10
13
14
15
16
19
20
21
22
25
26
27
28
5
11
17
23
29
31
32
33
34
35
6
12
18
36
24
30
Fig.1 Fixing the X-axis position and attaching magnets by fastening the screw on the side
20x20 magnet
(Frame kit included)
◇
CABINET installation
(IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. C Frame installation
-+
MAGNET
CASE 1 ) When there is no Z step: No separate
attachment specifications
CASE 2 ) In case of step difference: Attach 2 magnets
so that the sheet faces toward the “-” side
(Sheet can be additionally attached depending on the
level of the step)
Summary of Contents for IFA Series
Page 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Page 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Page 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Page 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Page 200: ...Thank you ...
Page 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...