Manual
Double Sheet Control System R1000 series L20
with integrated fieldbus interface
B0063191 / 1.3
Operation
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
99
8.4
Measuring channel calibration (after sensor exchange)
1
When replacing the sensor you should proceed in concordance with chapter 4.3 "Mounting
of sensors".
2 Press
the
MENU
key, switch to "change" with the
▲
key and confirm by pressing the
ENTER
key.
3
Enter the password (if active)
4
Switch to “adjustment parameter” and confirm by pressing the
ENTER
key.
5
At “measuring channel calibration” choose “yes” and confirm by pressing the
ENTER
key.
6
Set the sheet thickness for the measuring channel calibration and confirm by pressing the
ENTER
key.
7
Place the calibration sheet between the sensors and confirm by pressing the
ENTER
key.
8
Confirm the completion of the measuring channel calibration by pressing the
ENTER
key.
9
Return into the measurement mode by pressing the
MENU
key