Roche Diagnostics
A-24
Operator’s Manual · Version 3.1
2 Introduction to the instrument
Cedex Bio System
Daily operation
Reagent and diluent handling
Reagent disk
On the instrument, the reagents are stored on a reagent disk. It provides space for 27
bottles, allowing up to 14 reagent sets to be installed on the disk, assuming that most
tests need two reagents. Extra diluents and cleaners are also loaded on the reagent
disk.
9
Finishing the shift
1. Check for unfinished orders.
Workplace
>
Orders
Choose
>
Not Finished
2. Check for non-validated results.
Workplace
>
Result Review
Choose
>
Not Accepted
3. Check for non-transmitted results.
(If working with a host system only.)
Workplace
>
Result Review
Choose
>
Not Sent to Host
4. Start the
End Shift
wizard.
Overview
>
End Shift
5. Perform the daily backup.
Utilities
>
Export
>
Database
6. Export the full results.
Utilities
>
Export
>
Results
7. Clean up the database.
Workplace
>
Orders
>
Workplace
>
Result Review
>
Workplace
>
QC Status
>
Workplace
>
QC History
>
Workplace
>
Calibrations
>
8. Perform the maintenance actions
that are due.
Utilities
>
Maintenance
9. Replace cuvettes.
Overview
>
10. Check the external fluid containers.
Overview
>
>
11. Remove the reagent disk (if last
shift).
Overview
>
>
12. Log off the system.
Overview
> button with your user name
13. Shut down the system and switch off
the instrument (if last shift).
n/a
n/a
Task
Steps
Navigation
With wizard As individual steps
Table A-1
Overview of the daily operation tasks (Continued)
A
Reagent disk
B
Reagent bottle with barcode
C
Chimney
Figure A-4
Equipment for reagent handling
A
B
C
Summary of Contents for Cedex Bio
Page 1: ...Cedex Bio System Operator s Manual Software Version 2 1...
Page 10: ......
Page 22: ...Roche Diagnostics A 14 Operator s Manual Version 3 1 1 Safety Cedex Bio System Safety labels...
Page 130: ...Roche Diagnostics A 122 Operator s Manual Version 3 1 4 Software Cedex Bio System Buttons...
Page 131: ...5 Daily operation B 3 6 Special operations B 91 7 Configuration B 133 Operation B...
Page 132: ......
Page 303: ...8 General maintenance C 3 Maintenance C...
Page 304: ......
Page 339: ...9 Messages and alarms D 3 10 Result flags D 23 11 Troubleshooting D 39 Troubleshooting D...
Page 340: ......
Page 392: ......
Page 471: ...Glossary F 3 Index F 11 Glossary and Index F...
Page 472: ......
Page 492: ...Roche Diagnostics F 22 Operator s Manual Version 3 1 Index Cedex Bio System...
Page 493: ...Revisions G...
Page 494: ......
Page 495: ...Roche Diagnostics Operator s Manual Version 3 1 G 3 Cedex Bio System 18 Revisions Revisions...
Page 496: ...Roche Diagnostics G 4 Operator s Manual Version 3 1 18 Revisions Cedex Bio System...