46
Spindle Replacement Procedure – HSD 939
Perforex BC 1008/2014 HS and BC 1007/2007 HS
Note: The newer HSD 951 replacement is similar to the HSD 939 with the exception of the alignment
measurement noted in Section 3.17.2.
3.17.1
Removal
Before powering down the machine, move the Y-Axis to a comfortable position for
maintenance and full access to the top and bottom of the spindle. A lift cart works well
as a work bench, if jacked directly beneath the spindle assembly.
Once you have the spindle in a good working position, Power Down the machine and
properly lock out/tag out according to company procedures.
Shut off and lock out the machine air supply.
Remove the outer and inner spindle
covers.
The outer cover has four screws, two
on top and two on the bottom.
The inner cover has multiple screws
along the spindle face flange and screws
under the outer cover.
Summary of Contents for BC 1007 HS
Page 54: ...54 ...
Page 55: ...55 ...
Page 59: ...59 Figure 2 Tool in Spindle Clamped Feedback ...
Page 60: ...60 Figure 3 Tool in Spindle Ejected Feedback ...
Page 78: ...78 o Select the Calculate Base Offset button in the lower portion of the popup screen ...
Page 81: ...81 ...
Page 87: ...87 ...
Page 88: ...88 ...
Page 89: ...89 ...
Page 90: ...90 ...
Page 91: ...91 ...
Page 92: ...92 ...