Step 06: Mounting
the Control Box:
The control box comes with an
Australian Standard power cord wired in.
Remove the cover of the control box,
use 4 screws or bolts (not provided) to
mount to a secure surface.
The plugs must be facing downwards,
and at least 100cm above the ground.
All wiring at high voltage (240VAC/50Hz)
must be completed by a qualified electrician.
Step 07: Running the Motor Cable
The GTR058 requires a power line for gate motor arm 2 to be run underground for connection to the
control box. For safety the 6m cable needs to be run through conduit under your driveway.
•
Dig a trench approximately 150mm deep between your two gate posts.
•
Using ø40mm or ø20mm conduit, run the cable for motor 2 through the trench, using 90° conduit fittings
to bring the cable up where it meets the gate motor and control box at each end.
If using ø20mm conduit the motor plug for gate motor 2 will need to be cut and wired back into the control
box. Refer to the control board wiring diagram on page 25 (for pull to open) or page 27 (for push to open)
•
Connect the cable for Motor 2 to the control box.
• Fill in the trench to secure the electrical conduit in place.
Fig 14
Fig 15
150mm Minimum
ø
40mm or
ø
20mm conduit
Control
Box
Motor 02