B-8
Connector pinout and hardware installation details
B.4 Encoder input (J3)
B.4.1 Connector pinout
15-way D-type male. The connector is viewed from the wiring side.
Table B.4 – J3 connector pinouts (encoder input)
Pin
Function – RLE
Function – HS20
Function – RGH
1
Do not connect
Do not connect
Do not connect
2
0 V – signal ground
0 V – signal ground
0 V – signal ground
3
/Error
/Overspeed
/Error
4
/Z
/Unstable
/Z
5
/B quad *
/B quad *
/B quad *
6
/A quad *
/A quad *
/A quad *
7
Do not connect
Do not connect
5 V
8
Do not connect
Do not connect
5 V Sense
9
Do not connect
Do not connect
0 V Sense
10
Do not connect
Do not connect
Do not connect
11
Error
/Beam blocked
Error
12
Z
/Beam low
Z
13
B quad *
B quad *
B quad *
14
A quad *
A quad *
A quad *
15
Do not connect
/Reset
Inner screen
(pass through)
Shell
Case
Case
Case
*
Float detection will sense most combinations of local disconnection on this interface.
WARNING
: The reference port uses the same connector configuration as the sensor.
If a reference switch or other device is accidentally connected to the RLE10 sensor
ports, the sensor network operation may become disrupted. This may cause errors on
the RCU10 system but no damage will be caused. Always ensure that nothing is
connected to the RLE10 sensor ports when not in use.
!
Summary of Contents for RCU10
Page 1: ...Installation and user s guide M 9904 1122 09 A RCU10 quadrature compensation unit...
Page 11: ...viii Contents This page is intentionally left blank...
Page 23: ...1 12 System overview This page is intentionally left blank...
Page 39: ...2 16 System design...
Page 49: ...3 6 Kit configuration and part identification This page is intentionally left blank...
Page 67: ...4 18 System installation This page is intentionally left blank...
Page 91: ...A 6 RCU10 system specifications This page is intentionally left blank...
Page 147: ...E 8 Commissioning tests This page is intentionally left blank...
Page 175: ...F 28 Extended capability This page is intentionally left blank...
Page 189: ...G 14 Reference This page is intentionally left blank...
Page 193: ...H 4 Test records This page is intentionally left blank Cut here Cut here...
Page 195: ...H 6 Test records This page is intentionally left blank Cut here Cut here...