E-4
Commissioning tests
Use the Renishaw XCal-View data analysis software to calculate the accuracy and
repeatability of the machine according to ISO230-2.
Under ideal conditions the accuracy should be 2 ppm ± 5 µm (0.0002 in) or better for both
HS20 and RLE20. The repeatability should be 2.5 µm (0.0001 in) or better.
NOTE:
Analysis should be conducted with a full understanding of additional error sources
due to alignment of the XL-80. Errors such as cosine error and Abbé offset error should
be approximated and subtracted from any overall system accuracy value obtained from
XCal-View.
E.1.3
Test 2 – Workpiece thermal expansion compensation
This is a repeat of test 1, with workpiece compensation enabled on both the RCU10
compensation system and on the XC-80 calibration system. This will test that workpiece
thermal compensation is operating correctly.
Set up the XL-80 and XC-80 as described in section E.1.1 on the axis under test.
Ensure that the RCU10 controlling the axis under test has been referenced. This will
automatically activate air refractive index compensation in the RCU10.
Move the axis under test to a position near the axis reference position.
Datum the XL-80 (inputting an offset, if required, to allow the XL-80 and RCU10 to
display the same position).
Open the
Configuration
screen in RCU CS and select the
Parameters
tab. Ensure
that a valid value for workpiece expansion compensation has been set in the active
parameter table. Make a note of this value for the axis under test (close the display
screen afterwards).
Activate workpiece compensation for the RCU10 by taking the workpiece
compensation line on the Auxiliary I/O connector low using the machine controller.
Check that the ‘
WP
’ light in the RCU CS
Compensation
screen is on (this indicates
a successful activation).
Activate compensation on the XL-80 laser by setting the expansion coefficient to the
same coefficient as set in the compensator unit (noted above).
Perform the ISO230-2 test as per test 1, noting the accuracy and repeatability
figures. This test should be compared against the machine's specification, as this is
testing the features of the RCU10 compensation system that are normally used. (If
using structure compensation, repeat the test with structure compensation enabled
to obtain true operational results.)
Summary of Contents for RCU10
Page 1: ...Installation and user s guide M 9904 1122 09 A RCU10 quadrature compensation unit...
Page 11: ...viii Contents This page is intentionally left blank...
Page 23: ...1 12 System overview This page is intentionally left blank...
Page 39: ...2 16 System design...
Page 49: ...3 6 Kit configuration and part identification This page is intentionally left blank...
Page 67: ...4 18 System installation This page is intentionally left blank...
Page 91: ...A 6 RCU10 system specifications This page is intentionally left blank...
Page 147: ...E 8 Commissioning tests This page is intentionally left blank...
Page 175: ...F 28 Extended capability This page is intentionally left blank...
Page 189: ...G 14 Reference This page is intentionally left blank...
Page 193: ...H 4 Test records This page is intentionally left blank Cut here Cut here...
Page 195: ...H 6 Test records This page is intentionally left blank Cut here Cut here...