
6-6
Operation
6.3 General maintenance
The RCU10 system requires no routine maintenance. If any fault is present in the system,
it will normally be indicated by one of the error status signals which may be monitored via
the machine control or the RCU CS software display.
It is recommended, however, to periodically verify the correct operation of the system and
environmental sensors, as any fault here may cause an inaccuracy in the feedback
system. The frequency of this verification is dependent on the nature of the application.
Note:
The RCU10 contains a lithium metal battery. Please contact Renishaw for details of
battery replacement. (The customer must not change the battery). Typical battery
life is ten years. At end of life the RCU10 must be disposed of in accordance with
local regulations.
The use of this symbol on the batteries, packaging or accompanying
documents indicates that used batteries should not be mixed with
general household waste. Please dispose of the used batteries at a
designated collection point. This will prevent potential negative effects
on the environment and human health which could otherwise arise from
inappropriate waste handling. Please contact your local authority or
waste disposal service concerning the separate collection and disposal
of batteries. All lithium and rechargeable batteries must be fully
discharged or protected from short circuiting prior to disposal.
Summary of Contents for RCU10
Page 1: ...Installation and user s guide M 9904 1122 09 A RCU10 quadrature compensation unit...
Page 11: ...viii Contents This page is intentionally left blank...
Page 23: ...1 12 System overview This page is intentionally left blank...
Page 39: ...2 16 System design...
Page 49: ...3 6 Kit configuration and part identification This page is intentionally left blank...
Page 67: ...4 18 System installation This page is intentionally left blank...
Page 91: ...A 6 RCU10 system specifications This page is intentionally left blank...
Page 147: ...E 8 Commissioning tests This page is intentionally left blank...
Page 175: ...F 28 Extended capability This page is intentionally left blank...
Page 189: ...G 14 Reference This page is intentionally left blank...
Page 193: ...H 4 Test records This page is intentionally left blank Cut here Cut here...
Page 195: ...H 6 Test records This page is intentionally left blank Cut here Cut here...