Commissioning
6
82
Figure 6.35:
Cleaning flap in closed position, at the front in the direction of
travel
Prerequisites:
The hydraulic system is switched on.
1.
Open the hopper cover of the machine.
2.
Fill the machine evenly. Use a front-end loader or auger for this purpose.
3.
Check the level in the hopper for visibility.
4.
After finishing the filling process, close the hopper cover again.
The machine is now full.
1
Summary of Contents for AXENT Series
Page 8: ...Intended use 1 2...
Page 32: ...Safety 3 26...
Page 54: ...Technical data 4 48...
Page 56: ...Transport without tractor 5 50...
Page 122: ...Spreading operation 7 116...
Page 124: ...Faults and possible causes 8 118...
Page 162: ...General maintenance and servicing 9 156...
Page 168: ...Index D...
Page 170: ......