Spreading operation
105
7
7.5
Spreading lime (LIME-PowerPack)
7.5.1
Spreading operation procedure with AXENT 100.1
The intended use of the machine includes compliance with the operating, main-
tenance, and service conditions in accordance with the manufacturer specifica-
tions.
Spreading
therefore always includes
preparation
and
cleaning/maintenance
.
Carry out spreading work according to the sequence described below.
Preparation
Attaching the large area spreader to the tractor
Removing the feeder mesh and separating plate
Attaching the lime spreading unit to the large area
spreader
Closing the pre-metering sliders
Filling the machine
Making machine settings (density, travel speed,
application rate etc.)
See the operating manual
for the AXENT ISOBUS
device control
Travel to the spreading location
Spreading operation
Switching on the PTO shaft
Opening the pre-metering sliders and starting the
spreading operation
Starting the spreading work
Finishing the spreading operation and closing the
pre-metering sliders
Switching off the PTO shaft
Cleaning/maintenance
Discharging residual material
Cleaning and maintenance
Chapter 9
Switching off the large area spreader
Summary of Contents for AXENT Series
Page 8: ...Intended use 1 2...
Page 32: ...Safety 3 26...
Page 54: ...Technical data 4 48...
Page 56: ...Transport without tractor 5 50...
Page 122: ...Spreading operation 7 116...
Page 124: ...Faults and possible causes 8 118...
Page 162: ...General maintenance and servicing 9 156...
Page 168: ...Index D...
Page 170: ......