RANS S-20 RAVEN
TEXT MANUAL
09
/01/2013
01C-04
35.
Both elevators are now ready for static mass balancing. For instructions
refer to
RIGGING
.
FINAL INSTALLATION OF ELEVATOR
(AFTER COVERING, PAINT, ASSEMBLY AND MASS BALANCE OF
ELEVATOR)
36.
Bolt both elevators at their hinge points to the corresponding horizontal
stabilizer.
37.
Lubricate hinge points and check for free movement without binding or
excessive friction.
38.
Connect elevators to elevator push-pull tubes as per parts manual.
39.
IMPORTANT:
Make sure the rod-ends are at least 10 full threads
engaged in the end fittings.
40.
Check deflection of elevator and trim tab. For instructions refer to
RIGGING
.