![Rans S-20 RAVEN Text Manual Download Page 112](http://html1.mh-extra.com/html/rans/s-20-raven/s-20-raven_text-manual_3669201112.webp)
RANS S-20 RAVEN
TEXT MANUAL
09/01/2013
03I-01
ROTAX 912ULS - BATTERY BOX ASSEMBLY & INSTALLATION
(FINAL INSTALL OF ENGINE)
ASSEMBLY
1.
Refer to the parts catalog and select the required components for
assembly.
2.
Firewall should have been drilled to match Battery Box Mount Plate. Refer
back to
FIGURE 03A-02
.
3.
Cleco Support Angles to inside of Front Plate. Refer to the parts drawing.
Transfer drill #30 and rivet. Base of Battery will set on Support Angles.
4.
Align one edge of Battery Box Front Plate with edge of Battery Box Mount
Plate. Clamp together and transfer drill #11 though upper and lower mount
holes in Mount Plate and cleco.
5.
Slip Battery into assembly. Align free edge of Plates; pull Front Plate
against battery. Check to see if Battery can be slid in and out. If battery
cannot be slid in and out, then loosen fit slightly to allow easier removal.
Clamp and transfer drill #11 through upper and lower mount holes and
cleco.
6.
Transfer drill #30 the center holes in Mount Plate, and rivet from the AFT
side.
7.
Slide the Battery Bar through the holes in the Battery Box assembly.
Modify the Battery Bar per
FIGURE 03I-07
. Remove Battery from Battery
Box assembly
INSTALLATION
8.
Bolt Battery Box assembly to firewall.
9.
Install Battery and Battery Bar. Install Small Cotter Pins to retain Battery
Bar.
10.
Refer to the
ENGINE ELECTRICAL
section for Battery Cable and routing.