09/01/2013
RANS S-20 RAVEN
TEXT MANUAL
00-46
S-20 WINGS – FINAL ASSEMBLY & INSTALLATION
Refer to Section 5 and complete the following items:
•
AILERON AND FLAP ASSEMBLY AND INSTALLATION
o ASSEMBLY
Refer to Section 5 and complete the following items:
•
AILERON AND FLAP ASSEMBLY AND INSTALLATION
o INSTALLATION
•
WING TIP ASSEMBLY AND INSTALLATION
o WING TIP FIT UP AND ASSEMBLY
o INSTALLATION
•
ROOT SKIN INSTALLATION
o INSTALLATION
•
LIFT STRUT ASSEMBLY
o INSPECTION OF STRUTS
o ASSEMBLY
•
FUEL LINE AND VENT INSTALLATION - WING
o AFTER COVERING AND PAINTING OF WINGS
•
WING INSTALLATION
Refer to Section 2 and complete the following items:
•
AILERON CABLE SYSTEM INSTALLATION FUSELAGE
o
POST WING INSTALLATION
Refer to Section 11 and complete the following items:
•
WINGS
o WING WASHOUT RIGGING
o AILERON RIGGING
o FLAP RIGGING