09/01/2013
RANS S-20 RAVEN
TEXT MANUAL
00-38
S-20 ASSEMBLY FLOW CHART – DETAILED
Note:
The headings in the detailed flow charts on the following pages
refer to text manual headings.
S-20 FUSELAGE – PRE-COVERING ASSEMBLY
Refer to Section 1 and complete the following items:
•
PREP AND PRIME FUSELAGE FRAME AND RUDDER FRAME
o
RUDDER FIT-UP AND REMOVED
•
FUSELAGE FORMER INSTALLATION
o
TOP FORMER
o
LOWER SIDE FORMERS
o
CENTER SIDE FORMERS
o
OUTER BELLY FORMERS
o
CENTER BELLY FORMER
o
VERTICAL STABILIZER RIB
•
ELT AND COMMUNICATION ANTENNA INSTALLATION
o
ELT ANTENNA MOUNT PLATE
o
COMMUNICATION ANTENNA MOUNT PLATE
•
BAGGAGE WINDOW
•
BAGGAGE WINDOW FRAME INSTALLED
•
BAGGAGE COMPARTMENT
o
AFT BAGGAGE FIT-UP AND REMOVED
o
FWD BAGGAGE FIT-UP AND REMOVED
•
RUDDER SYSTEM ASSEMBLY AND INSTALLATION
o
RUDDER CABLES ROUTED THROUGH PULLEYS AT STATION 7
•
HEADER TANK MOUNTS
o
HEADER TANK MOUNTS RIVETED
•
SLIDING SEAT ASSEMBLY
o
SLIDING SEAT BRACKETS RIVETED WITH WASHERS
o
RIVET NUT INSTALLED
•
ELEVATOR TRIM SERVO WIRE
o
ROUTED INSIDE CENTER SIDE FORMER